Foundation Assessment Documents: What You Should Receive

The paperwork an evaluation should produce — report, scope, exclusions, elevation data, and warranty terms — and how to use it to compare providers.

Updated September 16, 2026 6 min read
A folder of foundation assessment documents fanned out on a table with an elevation diagram visible

The paperwork a foundation evaluation should leave you with, and what each document is actually good for.

Why the paperwork is the product

An evaluation visit is an hour or two of someone’s attention. What you are left with afterwards is the document, and the quality of that document is what determines whether the visit was worth anything.

A good set of paperwork lets you compare providers, take a second opinion, understand what you are buying, and — years later — show a buyer what was done. A thin one leaves you with a number and a memory of a conversation.

The evaluation report

This is the core document. It should contain three things, kept apart:

Findings. The elevation data and documented observations. Stated as facts: what was measured, what was seen, where, and in what condition.

Interpretation. What the company believes those findings indicate, with the reasoning visible. Stated as opinion, because that is what it is.

Recommendation. Either a proposed approach, or a recommendation to monitor with a suggested interval.

The separation is not a formality. It lets you accept the measurements while questioning the conclusion, and it lets another contractor or an engineer pick the document up and work from it. A report that mixes all three into a single narrative is harder to check, which may be the point.

Elevation contour sheet with annotations showing floor height readings across a house plan

The elevation data

The single most valuable item, and the one most often missing.

Relative floor-level readings at points across the house, referenced to each other, presented in a form you can read — a plan with figures, a contour sheet, or a table tied to locations. The reading positions should be identifiable so the survey can be repeated later and compared.

That repeatability is the point. A single survey is a snapshot; two surveys separated by a year are evidence about whether anything is moving. If you are being advised to monitor, the data from this visit is what you will be monitoring against.

The scope

Where repair is proposed, the scope document should state:

ElementWhat it should say
MethodThe named system, not just “piers”
Quantity and locationHow many supports, where, and what the survey says about why
Depth basisDriven to refusal, and how variance is handled
InclusionsEvery operation covered by the price
ExclusionsWhat is not covered, written explicitly
Access and restorationWhat is disturbed and what is reinstated
PermitsWho applies, who pays
ScheduleExpected duration and what would extend it
PaymentDeposit, stages, final

The exclusions section is the one that most often does not exist. Its absence is not neutral: a scope with no stated boundaries has left them to be determined later, at a moment when you have less leverage.

Two scope documents side by side with exclusions sections marked

The warranty terms

The full written document, not a summary line on the proposal. Duration, what triggers a claim, how a claim is measured, what is excluded, what obligations sit with you, and whether and how it transfers on sale.

Ask for it before you commit rather than after. If it is only available post-signature, that is a meaningful answer. The warranty guide covers what to look for inside it.

After the work: the second set

If a project goes ahead, a further set of documents should come out of it.

Installation records — location, depth, and pressure for each support. This is genuine site-specific subsurface information about your property, and it is the evidence that each location reached competent material rather than stopping on an obstruction.

Post-repair elevation documentation — the floor plane after the work, which becomes the baseline for any warranty claim.

Permit and inspection records where applicable.

Keep all of it with the pre-work set. Together they are the file that turns “there was some work done” into a documented, verifiable repair when you come to sell — as the guide to buying a previously repaired home explains from the buyer’s side.

For what produces these documents in the first place, see foundation evaluation and what happens during a foundation evaluation.

FAQ

Questions about this topic

What documents should I receive after an evaluation?
At minimum: a written report containing the elevation data and documented observations, an interpretation of what those findings indicate, and either a proposed scope with method, quantities, inclusions, exclusions, schedule, and warranty terms, or a recommendation to monitor with a suggested interval. If all you receive is a price on a single page, you have a quotation but not an assessment, and there is nothing there for another provider or an engineer to work from.
What is elevation data and why does it matter?
Relative floor-level readings taken at points across the house and referenced to each other, showing the shape of the floor plane — where it is high, where it is low, and by how much. It matters because it is the only part of the assessment that is a measurement rather than an observation or an opinion. It is also the baseline against which any future change is judged, which is why post-repair elevation documentation is worth insisting on.
How do I compare two providers' documents?
Line them up section by section rather than comparing totals. Assessment method, elevation data present or absent, method proposed, quantities and how they were derived, what is included, what is explicitly excluded, permits, schedule, warranty terms, and payment structure. Where one document has a section the other does not, that gap is itself the finding. The quote comparison worksheet sets this out as a table.
Should the report tell me the cause?
It should state an interpretation and show the reasoning. It should not present a cause as established fact where the evidence supports more than one explanation, and it should flag where a further step is needed — a hydrostatic plumbing test, or an independent engineer's opinion. A report that asserts a single confident cause without acknowledging alternatives is overstating what the visit could establish.
Do I get to keep the report if I do not hire the company?
You should, and with us you do. A report that is withheld unless you sign is a sales tool rather than an assessment. You paid for the visit with your time at minimum, and the document is about your property.

Still have a question about your property?

Ask it directly. We answer quote requests within one business day, and we will tell you if the answer needs an on-site look rather than a guess.

Request a Quote

Learn more about Foundation Evaluation

This guide covers the general picture. The service page explains what we actually do, what the scope includes, and what it excludes.